Author Archives: hwy401admin

Transportation Environmental Study Report Addendum – Highway 401 / Bloomfield Road Underpass Replacement and Interchange Reconfiguration

The Transportation Environmental Study Report (TESR) Addendum for the Highway 401/Bloomfield Road Underpass Replacement and Interchange Reconfiguration project is now available. The TESR Addendum will be available for an extended public comment period from Thursday, March 31, 2022, until Wednesday, June 1, 2022.

Please click here for the TESR Addendum.

Notice of Completion

In 2008, the Ontario Ministry of Transportation (MTO) completed a Transportation Environmental Study Report (TESR) for Highway 401 Improvements that recommended improvements at the Bloomfield Road interchange and underpass (GWP 80-00-00). In 2019, MTO retained Stantec Consulting Ltd. to review and update the 2008 TESR-approved plan for improvements to the Highway 401/Bloomfield Road interchange, and document changes in a TESR Addendum.

The TESR Addendum will be available for an extended public comment period from Thursday, March 31, 2022, until Wednesday, June 1, 2022, at: www.highway401tilburytolondon.ca.

Click Here for the detailed notice in English.

Cliquez ici pour l’avis détaillé en Français.

Notice of Online Public Information Centre

An online Public Information Centre (PIC) has been scheduled to provide an opportunity to review the existing conditions, potential impacts, and proposed improvements associated with the Bloomfield Road Underpass Replacement and Interchange Configuration project. In light of the COVID-19 pandemic and associated physical distancing requirements, the PIC will be hosted online. The PIC, with a recorded presentation, will be available on the study website at www.highway401tilburytolondon.ca from Tuesday, May 18, 2021, until Tuesday, June 1, 2021.

Click here for the detailed notice in English.

Cliquez ici pour l’avis détaillé en Français.

 

Notice of Study Commencement

The Ontario Ministry of Transportation (MTO) has retained Stantec Consulting Ltd. to complete the Preliminary Design, initiate Detail Design and Environmental Assessment (EA) for improvements to the Highway 401 corridor from Tilbury to London (118 km). The study area is located within the Municipality of Chatham-Kent, Elgin County, Middlesex County, and City of London.

Click here for the detailed notice.