Contact

Contact The Project Team

Comments regarding the study are welcome at any time.

To provide your comments or to be added to our mailing list, use the form below.

Project Team contact information:

Adam Barg, P. Eng.
Consultant Project Manager
Stantec Logo
Stantec Consulting Ltd.
200-835 Paramount Drive
Stoney Creek ON L8J 0B4
Tel: (905) 385-3234
Call collect: +0 collect
Fax: (905) 385-3534
comments@highway401tilburytolondon.ca

Paula Hohner, MScPl, MCIP, RPP
Senior Environmental Planner
Stantec Logo
Stantec Consulting Ltd.
600-171 Queens Avenue
London ON N6A 5J7
Tel: (519) 675-6666
Collect: +0 collect
comments@highway401tilburytolondon.ca

Valerie Nantais, P. Eng.
Senior Project Engineer
Ontario Logo
Ministry of Transportation 
659 Exeter Road, 4th Floor
London ON N6E 1L3
Tel: (548) 388-3180
comments@highway401tilburytolondon.ca

Appelez Tim Belliveau pour des informations en français.  Tel: 905-381-3224 (à frais virés)

Use the form below to provide any comments and indicate if you would like to be added to our mailing list. Please provide your name, mailing address, which GWP(s) you are interested in receiving project information for and choose your preferred method of contact.

Contact Form

GWP 3024-18-00: Widening/reconstruction of approximately 55 km of Highway 401 (addition of one lane in the median in each direction) and construction of a concrete median barrier – TESR Review and initiate Detail Design Group B Class EA

GWP 3025-18-00: Widening/reconstruction of approximately 10 km of Highway 401 (addition of one lane on the outside in each direction) and underpass improvements -TESR Review and initiate Detail Design Group B Class EA

GWP 3038-19-00: Widening/reconstruction of approximately 14 km of Highway 401 (addition of one lane in the median in each direction) and construction of a concrete median barrier – Preliminary Design and initiate Detail Design Group C Class EA

GWP 3073-17-00: Widening/reconstruction of approximately 39 km of Highway 401 (addition of one lane in the median in each direction) and construction of a concrete median barrier – Preliminary Design and Initiate Detail Design Group C Class EA

GWP 3078-18-00: Interchange and underpass improvements -TESR Review and initiate Detail Design Group B Class EA

GWP 3079-18-00: Interchange and underpass improvements – Preliminary Design and initiate Detail Design Group B Class EA

Freedom of Information and Protection of Privacy Act

Comments and information regarding this study are being collected to satisfy the requirements of the Environmental Assessment Act, and in accordance with the Freedom of Information and Protection of Privacy Act. With the exception of personal information, all comments will become part of the public record.