Contact Us
Highway 401 at Southminster Bourne, New Interchange Ramps (WP 3044-26-01)
To provide your comments on the new interchange ramps at Highway 401 and Southminster Bourne or to make a request to be added to the project mailing list, please email the project team at [email protected].
Project Team contact information:
Sinisa Sakic, P.Eng.
Project Engineer
Ministry of Transportation, West Region
Tel: (519)-854-9586 (+0 collect)
[email protected]
Kevin Welker, P.Eng.
Consultant Project Manager
Stantec Consulting Ltd.
Tel: 519 675-6652 (+0 collect)
[email protected]
Shane Vanhell, B.Sc.
Environmental Planner
Stantec Consulting Ltd.
Tel: (289) 212-8045 (+0 collect)
[email protected]
If you have any accessibility requirements in order to participate in this study, please contact the Project Team. For media inquiries, please contact [email protected].
Highway 401 Expansion – Tilbury to London
Comments regarding the study are welcome at any time.
To provide your comments or to be added to our mailing list, use the project mailing address below.
Project Team contact information:
Adam Barg, P. Eng.
Consultant Project Manager
Stantec Consulting Ltd.
200-835 Paramount Drive
Stoney Creek ON L8J 0B4
Tel: (905) 385-3234
Call collect: +0 collect
Fax: (905) 385-3534
[email protected]
Paula Hohner, MScPl, MCIP, RPP
Senior Environmental Planner
Stantec Consulting Ltd.
600-171 Queens Avenue
London ON N6A 5J7
Tel: (519) 675-6666
Collect: +0 collect
[email protected]
Valerie Nantais, P. Eng.
Senior Project Engineer
Ministry of Transportation
659 Exeter Road, 4th Floor
London ON N6E 1L3
Tel: (548) 388-3180
[email protected]
Appelez Tim Belliveau pour des informations en français. Tel: 905-381-3224 (à frais virés)
Freedom of Information and Protection of Privacy Act
Comments and information regarding these studies are being collected to satisfy the requirements of the Environmental Assessment Act, and in accordance with the Freedom of Information and Protection of Privacy Act. All comments will be maintained on file for use during the study and, with the exception of personal information, may be included in study documentation and become part of the public record.